A client in Denver told me my post holes looked like a drunk squirrel dug them
Honestly, I was setting posts for a cedar fence last month and thought I was doing fine. The homeowner came out, pointed at my holes, and said they were all over the place and looked like a drunk squirrel did the work. He was right, they were a bit off my usual line. I started using two strings instead of one, a main line and a parallel guide line exactly 8 inches out. Ngl, it added maybe 20 minutes to the layout but the posts went in perfectly straight. Has anyone else had a client call them out on something simple that you just got lazy about?