Vent: everyone says trust the load chart, but a near miss in Houston taught me to walk the radius myself
I was setting steel on a job off Beltway 8 two years ago and the chart said we had 400 lbs to spare, but the boom tip was already creeping when the wind picked up at 90 feet. Now I pace out the radius with a tape before every pick and the younger guys give me grief about it, but I'd rather look slow than watch a load swing where it shouldn't, so how many of you actually measure it out by hand anymore?
the boom tip was already creeping" is the part that gets me. Chart says one thing, the steel says another, and the steel always wins. Tape measure costs ten bucks, so yeah, keep pacing it out.