TIL I hit 47 drawers on one kitchen job in Bend and that's when I changed how I build them
I used to build every drawer box one at a time, fit it, set it aside, then start the next. Last summer I finished a big kitchen in Bend with 47 drawers and somewhere around number 30 I timed myself and it was taking almost 12 minutes per box just flipping between setups. So I built a jig that cuts all the sides and bottoms in one batch, and the last 17 boxes went way faster with fewer screwups. I get that some guys like the one-at-a-time flow, but I'm not going back, how do you batch your drawer runs?