Two inch pump line vs. three inch on a tight driveway pour
Last month I ran a 2 inch line on a 30 foot driveway because the pump wouldn't fit around the corner, and we spent an extra hour fighting the flow. My partner swore the 3 inch would have choked, but I think we would have been fine with slower dumping. Has anyone else dealt with this kind of clearance problem, or do you just eat the longer pump time?