Two inch pump line vs. three inch on a tight driveway pour
Last month I ran a 2 inch line on a 30 foot driveway because the pump wouldn't fit around the corner, and we spent an extra hour fighting the flow. My partner swore the 3 inch would have choked, but I think we would have been fine with slower dumping. Has anyone else dealt with this kind of clearance problem, or do you just eat the longer pump time?
That "extra hour fighting the flow" hit home, we had the same mess on a side walkway last summer and ended up hand bucketing the last few yards. Funny how the pump always fits fine until you actually need it to.