Switched from dry-cycling every tool to probing first, cut my scrap rate on the Haas to almost nothing
Ran a batch of 200 aluminum brackets in Rockford with dry cycles for 6 weeks and kept scrapping the first 3 parts every setup, so I started probing each blank and touching off with a Renishaw instead of trusting the offsets. Anyone else find that probing every part is worth the extra 40 seconds, or do you just trust one good setup?
40 seconds times 200 parts is over two hours of spindle time you gave away, and on a 6 week run that adds up to a full shift. A good setup holds offsets fine if the machine isn't losing position, so the scrap was probably telling you something else was wrong. Fix the root cause once instead of paying it back on every blank.