Course of bricks on the garage wall started walking off plumb and I caught it 3 courses too late
Was laying up a detached garage job in Allentown last week and my corner poles drifted out about 3/8 inch by the fourth course. Turns out the mortar was setting up faster than I could tap the bricks in, so they never fully seated and each course pushed the next one over. I pulled the top 3 courses off before the mud got hard, cleaned the beds out with a chisel, and reset them against a line I strung tight on both corners. Took me an extra 2 hours but the wall is dead straight now and the homeowner never saw the mess. Any of y'all keep a plastic corner gauge on hand for this or do you just trust the line and check plumb every course?