16
Old lead told me I was overtesting harnesses... he had a point
I used to run continuity checks on every single pin of a 37-pin connector three times over. One Friday he pulled me aside and said 'you're costing us an hour per panel chasing ghosts.' Now I do one thorough pass and move on. Has anyone else had a lead dial back their check routine?
2 comments
Log in to join the discussion
Log In2 Comments
dakotam1716d ago
Hold on, are you telling me your lead actually convinced you to stop checking? How many times did you find a real fault after switching to the one pass method? I feel like that's the kind of advice that sounds good until a loose pin causes a field failure and suddenly it's your head on the block. Because in my shop, they'd rather we take an extra hour than risk a callback, so I'm genuinely curious if your lead's math actually checked out over a few months. Did you ever secretly double check one of your one-pass jobs after you left for the day, just to see?
7
the_andrew15d ago
Dakota, I secretly double checked once and found nothing, but that one time still haunts me.
2