Just realized our shop splits 50/50 on signing off their own work, and I'm not sure which side is crazy
Last Tuesday our lead in Wichita had us do a quick show of hands on whether an A&P should be able to sign off a task he did himself, no second set of eyes. About half the guys said that's the whole point of holding the cert, and the other half said they've caught their own dumb mistakes too many times to trust it. I've been on both sides of this depending on the job, honestly. On a simple panel swap I don't want to wait 20 minutes for someone to walk over, but on anything touching flight controls I want a second guy every single time. I think the real split is between paper planes and planes people actually fly, and I'm not sure our paperwork knows the difference. Where do you all land on this, does shop size change your answer?