Watched a driveway slab in Toledo go from sponge gray to glass in 40 minutes
Helped a crew pour a 24x30 drive in Toledo and the mud came off the truck so wet we almost panicked, then the finisher waited it out and hit it with the bull float at just the right window. By the time he ran the power trowel it looked like a mirror compared to that soupy mess at 8am. How do you all gauge that window when the mix comes in that wet?