Small win: finally figured out the edge slump on that sloped driveway in Reno
Kept getting a low spot on the right side every time I pulled a straightedge across, and it turned out my form stake was sitting about a quarter inch low after the first pour settled. Took me 3 extra hours over two days of head scratching, but I got the last two slabs dead flat, and the homeowner actually noticed. Any of you fight this on sloped work, or do you just overbuild the forms from the start?