Swapped the surface-supplied hat for a band mask on a shallow pier job and my bottom time went up, not down
I figured the full hat would be slower to don for 20 foot work off a barge in Galveston, but cutting the hose handling let me get 45 minutes of actual work in where I used to burn 15 just dressing. Has anyone else found the lighter gear keeps your air use steadier on those short shallow jobs?