Every guy on my crew swears by running lines loose, then a QA guy in Fresno changed my mind
He said my drops were fine but to add a drip loop at the box before I staple down, and I've done it on every install since March. It takes 20 extra seconds and keeps water off the connector. Anyone else get called out by an inspector on something small like that?
Drip loops have been code around here for years, but I've also seen plenty of boxes pass inspection without one. Water follows the wire either way, so the loop just buys you a little time before it gets to the connector. Not saying skip it, but 20 seconds on every single install adds up when half those boxes never see a drop.