Noticed a clean laydown at the old power plant in Gary
I was driving past the old Gary power plant last week and stopped to check out the demo work. The boilermakers had laid down all the tube bundles in perfect rows on the ground. Every joint was numbered and tagged. It's rare to see that kind of organization on a tear-out job. Have you guys ever seen a site that was just impressively prepped like that?